Safety & other
Preventive and safety-related measures ensure safe testing conditions, minimizing the risk of potential damage to the facility. For each project, a risk assessment will be carried out to anticipate and eliminate any potential risks that may be involved.
Safety & other
- Fire extinguishers (faom / Co2)
- Temporary safety areas
- Signing with safety warnings
- Cable protection and yellow jackets
- Floor and door protection
- Temporary shielding of doors / cable entry
- Labelling of loadbanks and connections